By Principal Engineering | August 11, 2011 at 04:33 PM EDT | No Comments
Construction of the Greenwood Bridge between Ridgefield Drive and Carrollwood Drive is scheduled to begin Wednesday, May 25, 2011 and scheduled to be completed by the end of the summer. Gray Construction Corporation will be completing the Greenwood Bridge repairs, which is estimated to be a 90 day project. Read the full article from St. John Parish at http://www.sjbparish.com/news_details.php?id=375
The following link will take you to photographs of the Greenwood Bridge repairs.
http://www.sjbparish.com/photos.php?pcid=57
The following link will take you to photographs of the Greenwood Bridge repairs.
http://www.sjbparish.com/photos.php?pcid=57